458
Fast to drop at down
well w
osho bar wored
qurishhaer - Diss at habisch al
poun
baithapong alt for salos Jutron Duf
with a aplicab tull
bt,vovob 3,$
Drago / fo maitasams
سلام
must ful-fs
was after low priblive
}
Manh
of jillastane; di tre batross
so withs labour di dovano
me je doos wilt brown fudintre
As othe
Jemput tuill
Todo poster epaimtlo postres : il gus
Jons eduroć natanids to stil and
downed t
You
3475
ount
Arsenal are
· destroyed and not reprovided,
and it appears from Paragraph 18 of Sir W. Des Vaux's Despatch dated the 15th January last, that many details have yet to be settled.
The settlement of such details, the re-provision of the Piers as may be necessary, and the satisfaction of indispensable requirements in connection with the Submarine Mining Service and the Arsenal Water-transport would form an essential part of the proposed arrangement.
The cost of the Praya would probably be increased in consequence; but there would be a considerable margin to meet this increased cost in the difference $82,465, between the present estimated cost $320,000 and the estimated value $402,465 of the reclamation in front of North Barracks.
Another matter which the Secretary of
458
Fast to drop at down
well w
osho bar wored
qurishhaer - Diss at habisch al
poun
baithapong alt for salos Jutron Duf
with a aplicab tull
bt,vovob 3,$
Drago / fo maitasams
سلام
must ful-fs
was after low priblive
}
Manh
of jillastane; di tre batross
so withs labour di dovano
me je doos wilt brown fudintre
As othe
Jemput tuill
Todo poster epaimtlo postres : il gus
Jons eduroć natanids to stil and
downed t
You
3475
ount
Arsenal are
· destroyed and not reprovided,
and it appears- from Paragraph 18 of Sir W. Des Vaux's Despatch dated the 15th January
last- that many details have yet to be
settled.
The settlement of such details, the re-provision of the Piers as may be necessary,
and the satisfaction of indispensable requirements in connection with the
Submarine Mining Service and the Arsenal Water-transport would form an essential
The cost part of the proposed arrangement. of the Praya would probably be increased.
in consequence; but there would be a considerable margin to meet this increased cost in the difference $82,465, between the present estimated cost $320,000 and the estimated value $402,465 of the reclamation in front of North Barracks.
Another matter which the Secretary
of
No comments yet.
Private notes are available after approval.